Load manifest Talimarjan TPP-2 · 2013–2017
Total cargo delivered 160,000+ CBM
Heaviest single item (gas turbine) 402 MT
Road-train with girder-bridge 850 MT
Inland route from the Caspian ~2,200 km
Other heavy lift and OOG packages 70–320 MT

Delivered for Hyundai Engineering & Construction, EPC contractor, across Uzbekistan and Kazakhstan.

Recent projects

2018 Uzbekistan

Adamtash Gas Project

Heavy lift gas compressors delivered to the construction site during the Kazakhstan winter.

Gas compressorsWinter transport
2013–2017 Uzbekistan

Talimarjan TPP-2, 929 MW CCGT

Turn-key logistics for Hyundai Engineering & Construction: heavy lift and OOG equipment, local customs clearance and a 2,200 km inland route from the Caspian through the Kyzylkum desert in Uzbekistan and Kazakhstan.

2 CCGT units402 MT gas turbineStack damper 10.5 × 9 × 10.2 mCondensers 9.2 × 3.3 × 14.5 m
2012–2015 Uzbekistan

Tashkent TPP, 370 MW CCGT

Advisory support for multimodal transport of General Electric equipment, including a 9FA gas turbine moved through populated urban areas.

1 CCGT unit281 t gas turbineUrban route

Full project details

Tell us what needs to move

Send the cargo list, dimensions and destination. We reply with a route proposal and a quote.

Rafico Engineering LtdElscot House, Arcadia AvenueLondon N3 2JU, United Kingdom
Security code